LMS Highways
  • Home
  • About Us
  • Our Services
    • Highway Repairs
    • General Civils & Associated Repairs
  • News
  • Case Studies
  • Sustainability
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Highway Repairs

CRCP Repairs, A30 Devon

LMS Highways install CRCP Repairs to busy A30 Devon

Working on behalf of Balfour Beatty, LMS Highways spent three weekend providing Continuously Reinforced Concrete Pavement Repairs to the A30 in Devon. This stretch of road is made up of high speed dual carriageway, high speed single carriageway and urban areas, due to this, our repair work was completed under full night time road closures, ensuring the safety of everyone on site and to reduce disruption for commuters.

The A30 is constructed using CRCP, continuously reinforced concrete pavement is constructed with steel reinforcing bars placed within the concrete, continuously along the entire length of the pavement. The result is a continuous, smooth-riding surface capable of withstanding the heaviest traffic loads and the most adverse weather conditions. Often proving a popular choice for highly trafficked areas due to being extremely heavy duty and offering a service life of around 20-40 years, or even longer with the proper maintenance.

Repairing CRCP requires precision and accuracy, after removing the damaged sections of concrete, new steel starter bars are installed at 150mm centres just slightly offset from where the existing ones are. The dowel bars are then resined into place and steel mesh/ reinforcing bars are attached at both ends running continuously along the length of the bay, ensuring the continuous reinforcement isn’t broken or disrupted.

Project outcomes:

  • 141 M3 Concrete Installed
  • 5.7 Tonnes of Steel
  • 373 Linear Meters of Joint Sealing

“I’m never apprehensive about working with LMS on our Network. Always professional and courteous. Excellent safety working practices. Great Team and top quality workmanship” – Claire Dean, Route Manager for Balfour Beatty

The video below shows the LMS team carrying out a CRCP bay replacement on the A30 carriageway during a full night time road closure.

18/08/2025/by Harriet Drew
Share this entry
  • Share on Facebook
  • Share on X
  • Share on LinkedIn
  • Share by Mail
https://lmshighways.co.uk/wp-content/uploads/2025/08/DSC08676-scaled.jpg 1704 2560 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2025-08-18 11:38:492025-10-09 11:41:17CRCP Repairs, A30 Devon

Categories

  • Frequently Asked Questions
  • Social Values
  • Highway Repairs
  • General Civils & Associated Repairs
  • News Items

Case Studies

  • A35 Flange Beam Replacement07/07/2026 -
  • LMS Highways Ltd
    A50 Flange Beam Replacement14/01/2026 -
  • A50LMS Highways
    A50 Multi-phase Project06/11/2025 -

LMS Highways Ltd.

Address:
LMS Highways
Cockington Court, Cockington Village,
Torquay, Devon, UK
TQ2 6XA

Contact:
contact@lmshighways.co.uk
01626 331771

Office Opening Hours:
Mon – Fri: 09:00 – 17:00

Terms & Conditions                            Privacy Policy

Terms of Purchase Order                    Brochure

 

Social Values

Proud supporters of

Copyright © LMS Highways Ltd. All Rights Reserved. Registered Company Number: 01098038; VAT Number: 232754709
  • Link to LinkedIn
  • Link to Facebook
  • Link to Youtube
  • Link to X
Link to: Industry Leading Rapid-Set Concrete Repairs Link to: Industry Leading Rapid-Set Concrete Repairs Industry Leading Rapid-Set Concrete RepairsRSTA Awards Innovation WinnerLMS Highways Ltd Link to: Premcrete Highways FC Cement Link to: Premcrete Highways FC Cement Premcrete Highways FC Cement
Scroll to top Scroll to top Scroll to top