Highway Repairs

A35 Flange Beam Replacement

2026 | A35 | Balfour Beatty – In January 2026, LMS Highways completed the replacement of a 5-metre-long steel flange beam – one of only two beam replacement of its kind on the UK highways network.

Read more
07/07/2026/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2026/06/Photo-30-01-2026-22-11-55-scaled-e1781177317797.jpg 1046 1920 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2026-07-07 10:00:392026-06-11 11:49:58A35 Flange Beam Replacement
Highway Repairs

A50 Flange Beam Replacement

LMS Highways Ltd

2025 | A50 | Balfour Beatty / Atkins – Starting in mid September, LMS Highways successfully delivered a complete removal and replacement of a 9-metre-long steel flange beam – the first beam replacement of its kind on the UK highways network.

Read more
14/01/2026/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2025/10/Photo-20-09-2025-01-13-25-scaled-e1761655739642.jpg 1024 2560 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2026-01-14 13:58:262026-04-02 13:09:35A50 Flange Beam Replacement
Highway Repairs

A50 Multi-phase Project

A50LMS Highways

2023-2025 | A50 | Balfour Beatty – Starting in September 2023, LMS Highways has completed five critical phases of CRCP repairs to the East and Westbound carriageway of the A50, Foston Hatton Hilton Bypass.

Read more
06/11/2025/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2026/03/Photo-10-05-2025-22-44-58-scaled-e1772796450243.jpg 976 1920 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2025-11-06 14:38:132026-03-17 15:53:00A50 Multi-phase Project
Highway Repairs

A35 & A30 Concrete Repair Scheme

2025 | A30 & A35 | Balfour Beatty JV – Starting in early June LMS Highways spend several weekends completing Continuously Reinforced Concrete Pavement repairs and joint sealing to the busy A30 Devon and A35 Dorset.

Read more
27/10/2025/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2025/08/Photo-04-07-2025-11-38-34-pm-1-scaled.jpg 1920 2560 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2025-10-27 15:06:032026-03-18 09:31:28A35 & A30 Concrete Repair Scheme
Highway Repairs

M20 Road Refurbishment Project

2024 | M20 | Milestone – LMS Highways spend several weeks completing crucial concrete bay replacements and associated repairs to both London and Coastbound carriageways of the M20, the main travel corridor to the English Channel.

Read more
23/06/2025/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2025/01/M20.jpg 700 1900 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2025-06-23 10:20:352026-03-18 09:30:58M20 Road Refurbishment Project
Highway Repairs

M271 Concrete Bay Replacements

2024 | M271 | MJ Church – Working on behalf of MJ Church, LMS Highways delivers safety critical and life extending repairs to the M271, the major travel corridor to Southampton Docks.

Read more
10/01/2025/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2025/01/M271.jpg 700 1900 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2025-01-10 11:41:222026-03-18 09:41:16M271 Concrete Bay Replacements
Highway Repairs

A11 Multi-Phase Concrete Bay Replacement Project

A11

2023 | A11 | M Group Services – LMS Highways delivers concrete bay replacements and various other repairs as part of a multi-phase reconstruction scheme on the A11.

Read more
01/06/2023/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2024/02/Untitled-1-1.jpg 700 1900 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2023-06-01 10:49:182025-10-27 13:06:20A11 Multi-Phase Concrete Bay Replacement Project
Highway Repairs

A2 CRCP Concrete Repairs Phase 1 & 2

2021 | A2 Boughton Bypass | Costain – LMS Highways deliver CRCP (Continuously Reinforced Concrete Pavement) and various other carriageway repairs to the A2, Boughton Bypass in multi-phase programme.

Read more
28/11/2021/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2021/11/Shift_Photo_image_2021-11-20-13-33-12_5e6-scaled.jpg 2560 1920 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2021-11-28 12:00:352025-05-13 12:43:28A2 CRCP Concrete Repairs Phase 1 & 2
Highway Repairs

Concrete Maintenance Project – M53

M53LMS Highways Ltd.

2021 | M53 | Balvac – LMS Highways spends several weeks working on a National Highways scheme delivering life extending concrete repairs to the busy M53.

Read more
08/02/2021/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2021/03/Shift_Photo_d9dba335-827d-41bd-bafb-058007e07a52_2021-02-20-02-20-08_394.jpg 1434 2448 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2021-02-08 12:30:252025-05-13 12:43:32Concrete Maintenance Project – M53
Highway Repairs

A449 North and Southbound Concrete Carriageway Repairs

LMS HighwaysLMS Highways Ltd.

2020 | A449, Wales | Alun Griffiths – Whilst the whole of the UK is in lockdown, LMS Highways have been in Wales repairing sections of failed concrete on the A449 on behalf of Alun Griffiths.

Read more
25/02/2020/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2021/03/IMG-20200304-WA0003-4.jpg 504 1200 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2020-02-25 15:23:392025-05-13 12:43:37A449 North and Southbound Concrete Carriageway Repairs
Highway Repairs

Residential Road Refurbishments – Kent

2019 | Sea Street & Old Thanet Way, Kent | Eurovia – Working on behalf of Eurovia, LMS Highways provides full ‘kerb to kerb’ package of repairs to residential roads; Old Thanet Way and Sea Street, Kent.

Read more
05/08/2019/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2024/05/DSC08341-min-scaled.jpg 1704 2560 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2019-08-05 15:35:272025-05-13 12:43:42Residential Road Refurbishments – Kent
Warehousing & Distribution

Distribution Yard Concrete Repairs – Kent

LMS HighwaysLMS Highways Ltd.

2019 | Rochester, Kent | Veetee Rice – The LMS Highways team completes refurbishments to fully operational distribution facility, proving once again our multiskilled workforce can deliver on time, within budget and with minimal disruption to client operations.

Read more
23/04/2019/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2021/01/IMG_0077-scaled.jpg 1920 2560 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2019-04-23 13:06:182025-05-13 12:43:48Distribution Yard Concrete Repairs – Kent
Highway Repairs

Urban Concrete Bay Replacement – Kent

Kent - Concrete Bay ReplacementLMS Highways Ltd.

2018 | Cranborne Avenue, Kent | Eurovia – LMS Highways delivers essential, full depth concrete bay replacements to Cranborne Avenue, a residential street in Maidstone, Kent.

Read more
23/02/2018/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2015/10/Residential-bay-removal-1.jpg 2120 4032 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2018-02-23 12:00:512025-05-13 12:43:52Urban Concrete Bay Replacement – Kent
Highway Repairs

‘Kerb to Kerb’ Solution – M180

M180LMS Highways Ltd.

2017 | M180 South Yorkshire | A-One+ – LMS Highways’ keeps the M180 flowing by providing unique services whilst delivering on time and budgetary savings.

Read more
01/09/2017/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2015/10/IMG_0064.jpg 3024 4032 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2017-09-01 12:00:062025-05-13 12:43:58‘Kerb to Kerb’ Solution – M180
Highway Repairs

Concrete Bay Replacement – Norfolk

Concrete Bay ReplacementLMS Highways Ltd.

2017 | Norfolk | Highways England – LMS Highways successfully proves their efficient and precise concrete bay replacement service on behalf of a major contractor for Highways England. – This article was published by HighwaysIndustry.com and reproduced with permission.

Read more
07/01/2017/by Harriet Drew
https://lmshighways.co.uk/wp-content/uploads/2015/10/Concrete-Bay-Replacement.jpg 3024 4032 Harriet Drew https://lmshighways.co.uk/wp-content/uploads/2019/04/lms-inline-transparency.png Harriet Drew2017-01-07 12:00:482025-05-13 12:44:02Concrete Bay Replacement – Norfolk

Contact Us

Contact:
contact@lmshighways.co.uk
01626 331771

Office opening Hours:
Mon – Fri: 9:00 – 17:00

LMS Highways Ltd.

Address:
LMS Highways
Cockington Court, Cockington Village,
Torquay, Devon, UK
TQ2 6XA

Contact:
contact@lmshighways.co.uk
01626 331771

Office Opening Hours:
Mon – Fri: 09:00 – 17:00

Terms & Conditions                            Privacy Policy

Terms of Purchase Order                    Brochure

 

Social Values

Proud supporters of

Copyright © LMS Highways Ltd. All Rights Reserved. Registered Company Number: 01098038; VAT Number: 232754709
  • Link to LinkedIn
  • Link to Facebook
  • Link to Youtube
  • Link to X
Scroll to top Scroll to top Scroll to top