2024 | M271 | MJ Church – Working on behalf of MJ Church, LMS Highways delivers safety critical and life extending repairs to the M271, the major travel corridor to Southampton Docks.
2023 | A11 | M Group Services – LMS Highways delivers concrete bay replacements and various other repairs as part of a multi-phase reconstruction scheme on the A11.
2021 | A2 Boughton Bypass | Costain – LMS Highways deliver CRCP (Continuously Reinforced Concrete Pavement) and various other carriageway repairs to the A2, Boughton Bypass in multi-phase programme.
2021 | M53 | Balvac – LMS Highways spends several weeks working on a National Highways scheme delivering life extending concrete repairs to the busy M53.
2020 | A449, Wales | Alun Griffiths – Whilst the whole of the UK is in lockdown, LMS Highways have been in Wales repairing sections of failed concrete on the A449 on behalf of Alun Griffiths.
2019 | Sea Street & Old Thanet Way, Kent | Eurovia – Working on behalf of Eurovia, LMS Highways provides full ‘kerb to kerb’ package of repairs to residential roads; Old Thanet Way and Sea Street, Kent.
2019 | Rochester, Kent | Veetee Rice – The LMS Highways team completes refurbishments to fully operational distribution facility, proving once again our multiskilled workforce can deliver on time, within budget and with minimal disruption to client operations.
2018 | Cranborne Avenue, Kent | Eurovia – LMS Highways delivers essential, full depth concrete bay replacements to Cranborne Avenue, a residential street in Maidstone, Kent.
2017 | M180 South Yorkshire | A-One+ – LMS Highways’ keeps the M180 flowing by providing unique services whilst delivering on time and budgetary savings.
2017 | Norfolk | Highways England – LMS Highways successfully proves their efficient and precise concrete bay replacement service on behalf of a major contractor for Highways England. – This article was published by HighwaysIndustry.com and reproduced with permission.